Cloakroom Refurbishment, Bridge of Don, Aberdeen

We don’t usually undertake cloakroom refurbishments unless they are more complex or are being done at the same time as another bathroom refurbishment. This project was both: more complex and completed alongside the main bathroom.

The layout stayed more or less the same, but it was a full refurbishment that in some ways went beyond what we would normally do in a standard bathroom. It matches the main bathroom in terms of features: underfloor heating, large tiles with epoxy grout, custom-built units (including a wall-hung toilet, black countertop basin, and wall-mounted tap), mosaic tiles above the worktop, a corner unit set at 45 degrees with an illuminated worktop area and mosaic tiles, a custom-made mirror running from the mosaic tiles down to the floor and from wall to wall, and a designer-style radiator with the pipes concealed in the wall.

Before

After

Project videos

Video 1
Video 2