A Walk-in Shower with Recessed and Pull-out Storage in Inverurie

A generous shower was only part of the brief for this bathroom in Inverurie. The owners also wanted useful storage, a basin area with drawers and a way to make better use of the space beside the shower. We replaced the bath with a walk-in arrangement and brought those requirements together in the new walls, rather than treating storage as something to add afterwards.

The photographs show the room during installation. They capture the new layout, marble-effect shower panels, smoked glass and wood-effect furniture. This was the main bathroom in a two-room project; the separate ensuite had its own layout and fittings.

Recessed storage beside the walk-in shower in the main bathroom during installation
Recessed storage beside the walk-in shower. Photographed during installation.

Planning around the whole room

We visited and worked through the owners’ earlier drawings and product ideas. Those were a starting point for discussion: the furniture and finishes continued to change as they visited suppliers, compared finishes and checked availability. A further visit helped us review the revised selections before work began, and the owners approved our main bathroom design.

The layout needed to do more than replace one fixture with another. Our scope included a new wall for the basin and a partition that also allowed a cupboard to open from the hallway. Thinking about both sides of a wall matters: the depth used inside a bathroom may be serving a useful purpose in the adjoining space too. We agreed a simpler hallway cupboard with a shelf and hanging rail, while developing the shower-end storage inside the bathroom.

The basin moved away from the window to the new wall, while the toilet was repositioned closer to the centre of the window wall. We considered the approach to these fittings alongside the shower entrance, so each part of the new layout had room to serve its purpose.

Main bathroom design proposal showing the shower, basin wall and adjoining hallway cupboard
Design proposal shared, showing the planned shower, basin wall and adjoining hallway cupboard.
Toilet beneath the window in the main bathroom during installation
Toilet beneath the window. Photographed during installation.
The toilet was repositioned beneath the window; different parts and viewpoints of the room are shown.
The toilet was repositioned beneath the window; different parts and viewpoints of the room are shown.

A walk-in shower in place of the bath

The new shower uses a long rectangular tray, with smoked glass defining the showering area. The owners compared clear and smoked screen options before choosing smoked glass. We also allowed for the separate shower mixer they were sourcing, checking the product list before installation rather than assuming every essential component came with the screen and tray.

A folding seat and grab rails formed part of the agreed arrangement, and the seat is visible folded against the wall in the installation photographs. These details need to be considered alongside the controls, entry space and glass. A generous tray alone does not determine how conveniently someone can use a shower; the position of each fitting matters as well.

Smoked glass walk-in shower screen in the main bathroom during installation
Smoked glass walk-in shower screen. Photographed during installation.
Fold-down shower seat and adjustable handset in the main bathroom during installation
Fold-down shower seat and adjustable handset. Photographed during installation.
Overhead shower and black controls in the main bathroom during installation
Overhead shower and black controls. Photographed during installation.
The former bath area and the new walk-in shower during installation.
The former bath area and the new walk-in shower during installation.

Making the shower-end wall useful

The owners raised a practical question during planning: could the space behind the shower-end wall do more than accommodate a bottle recess? They suggested a pull-out section for supplies such as toilet rolls, with open spaces higher up for rolled towels.

We agreed a lower pull-out unit and two towel recesses. The resulting arrangement gives different items different homes: bottles sit in a recess facing into the shower, the two taller openings face into the room, and a small door below provides access to the lower storage. Planning those openings together helps avoid a wall that looks neatly finished but leaves useful depth inaccessible.

The towel radiator sits beside the basin and this storage wall, keeping towels close to both areas. Its position was reviewed during planning, including the request to bring its pipe connections through the wall.

Tall recessed storage above the pull-out unit in the main bathroom during installation
Tall recessed storage above the pull-out unit. Photographed during installation.
Recessed storage beside the shower wall in the main bathroom during installation
Recessed storage beside the shower wall. Photographed during installation.
The former quadrant shower and the replanned basin and storage wall, shown from different viewpoints during installation.
The former quadrant shower and the replanned basin and storage wall, shown from different viewpoints during installation.

Drawers below, cupboard space above

Early discussions explored more extensive fitted furniture, including a purpose-built option. The final selection was an 800mm wall-mounted vanity with two drawers and a matching mirrored cabinet, supplied by the owners. The photographs show that coordinated furniture range in place of the larger bespoke scheme considered at the beginning.

The drawers bring everyday items forward when opened, while the cabinet above the basin adds enclosed storage at a different height. Leaving the floor visible beneath the vanity also gives access for cleaning. When choosing this combination, we consider the basin, waste and drawer arrangement together, as well as the position of the wall cabinet and nearby radiator.

Mirror above the wall-hung basin unit in the main bathroom during installation
Mirror above the wall-hung basin unit. Photographed during installation.
Two drawers beneath the basin in the main bathroom during installation
Two drawers beneath the basin. Photographed during installation.
The basin moved from beneath the window to a wall-hung unit on the replanned wall; different viewpoints are shown.
The basin moved from beneath the window to a wall-hung unit on the replanned wall; different viewpoints are shown.

Coordinating panels, flooring and trim

The owners settled on Levanto Marble panels for the main shower, white painted walls elsewhere and Karndean Oyster Slate LVT flooring. They chose oak-effect skirting and architrave after discussing the cost difference between foil-wrapped MDF and solid oak, and selected downlights for the room.

These choices balance the stronger pattern in the shower with quieter surrounding surfaces. The oak-effect trim introduces warmth around the edges, while the grey wood-effect vanity connects with the pale floor and veining in the panels. Reviewing finishes and complete product lists helped us coordinate customer-supplied materials before fitting began.

Towel radiator beside the basin unit in the main bathroom during installation
Towel radiator beside the basin unit. Photographed during installation.
The towel radiator was relocated beside the basin unit; different viewpoints are shown.
The towel radiator was relocated beside the basin unit; different viewpoints are shown.
Floor finishes before refurbishment and during installation; different areas and viewpoints are shown.
Floor finishes before refurbishment and during installation; different areas and viewpoints are shown.

Start with the way you use the space

The most useful improvement here came from considering the shower, storage and adjoining cupboard together. A bottle recess, towel openings and lower pull-out storage each answer a different everyday need, within one coordinated layout.

If you are considering a similar change, you can arrange a quotation visit or read how our quotation and work process works.