Existing toilet boxing may offer a place to conceal a cistern and keep the front of the fitting farther back. The available depth and position of pipes decide how much of that opportunity can be used.
Ask what space is actually available behind the finished surface and how the cistern can be accessed later. Then compare the proposed projection with the door opening and standing space, using the finished toilet outline on the plan.
The unit should still have a clean edge that you can reach beside the pan. Check the room with the service cover removed as well as in its finished state, so later access is considered before the surfaces are chosen.





