We try to lower the shower tray as much as possible, but sometimes the drainage in the house doesn’t allow us to make it floor level. If you look at some of our past walk in shower notice, you’ll notice that some of them have small steps.
Bathroom Specialists Aberdeen
We try to lower the shower tray as much as possible, but sometimes the drainage in the house doesn’t allow us to make it floor level. If you look at some of our past walk in shower notice, you’ll notice that some of them have small steps.
Prices in the construction industry are rising quickly, often faster than inflation and other general costs. As a result, we currently do not book projects more than 90 days in advance. This helps us make sure the price we quote can still cover the cost of materials and labour.
Our quotes are also guaranteed for 7 days only.
If you have an expired quote from us and are considering proceeding with the project, please contact us for an updated quote, as we will not be able to keep the same price.
Customers who have already accepted their quote and have a date booked in our calendar are unaffected. Accepted quotes have a guaranteed fixed price.
By requesting a quote, you agree to our Terms and Conditions.