This component of the quotation represents the ‘hidden costs’, which are substantial yet not always apparent to those outside the trade or without advanced DIY skills. We itemize these costs separately as we provide them at our purchase price, ensuring transparency and fairness in our pricing.
The typical requirements for a project include:
- Plasterboard
- Various timber products, such as CLS
- Plumbing materials, including connectors, pipes, waste, and isolating valves
- Insulation
- Plaster and Paint
- Screws
- Cleaning and Protective materials
- Adhesives, Grout, and Self-leveling compounds
- Trims
- Sealants
- Wires
- Consumables, like worktop jig cutters, sandpaper, blades, and masking tape
Occasionally, we include additional items such as UPVC ceilings or extractor fans in the quote. These items, though not significantly expensive to warrant individual detailing, will be explicitly mentioned in the project scope if included.